A decision on a proposed drug and alcohol rehabilitation centre at Ourimbah could be months away after the community consultation period was extended.
The Glen Road project faces strong opposition from nearby residents.

A decision on a proposed drug and alcohol rehabilitation centre at Ourimbah could be months away after the community consultation period was extended.
The Glen Road project faces strong opposition from nearby residents.
by
Tags: