TENDER AWARDED FOR HEXHAM BYPASS DESIGN

Plans for a future bypass of Hexham and Heatherbrae have taken a step forward, with the awarding of a tender to complete the concept design.

Jacobs Australia will carry out detailed traffic and environmental studies, as it fine-tunes the plan for the missing link between the M1 and the Pacific Highway.

The 15-kilometre stretch will include dual carriageway and a new crossing over the Hunter River.

Planning should be completed by 2017.

(VISION ONLY)


Posted

in

by